Linville, NC – Whether it was the old wooden bridge or the current steel bridge, the thrill of crossing the Mile High Swinging Bridge has provided Grandfather Mountain guests with worried anticipation, exhilaration and endless memories for decades. September 2, 2022 marks 70 years of the Mile High Swinging Bridge. Activities and special presentations will occur throughout the day.

One of the top highlights and memories of visits to Grandfather Mountain nature park is walking across the famous Mile High Swinging Bridge. Since 1952, visitors have “oohed” and “aahed” at the bridge’s 360-degree panoramic views. America’s highest suspension footbridge gives easy access to the spectacular views atop Grandfather Mountain’s Linville Peak, elevation 5,305 feet.

The 228-foot suspension bridge spans an 80-foot chasm at more than one mile in elevation (hence the name!). To reach the Mile High Swinging Bridge, drive the two-mile, winding scenic road up the mountain to the summit parking area by the Top Shop. Climb 50 stairs adjacent to the parking area or inside the Top Shop to reach the short pathway to the bridge. Also, an elevator in the Top Shop takes you to the third floor for a level walk to the bridge.Celebrating The 70th

Mile High Swinging Bridge History

Former North Carolina Tourism Director Charles J. Parker coined the name “Mile High Swinging Bridge” at the Bridge’s dedication in 1952. The term “mile high” refers to the structure’s elevation above sea level (5,280 feet). The term “swinging” refers to the fact that suspension bridges are free to sway.

The original 1952 bridge was designed by Charles Hartman Jr. of Greensboro, N.C. It was fabricated in Greensboro and then reassembled on top of the Mountain. Erecting the bridge took three weeks, a process slowed by inclement weather created by a hurricane off the North Carolina coast. Cost was $15,000. It was dedicated on Sept. 2, 1952 by North Carolina Gov. William B. Umstead.

The bridge was rebuilt in 1999 using the original towers. The cables, floor boards and side rails were all replaced using galvanized steel. One of the main advantages of the modern building materials is that they do not have to be painted. Now, Grandfather Mountain employees will not have to hang out over the gorge to paint the span. It was redesigned by Sutton, Kennerly & Associates Engineering of Asheville, N.C., and rebuilt by Taylor & Murphy Construction Company of Asheville. The cost of rebuilding was $300,000.

Tickets & Hours

Walking across the Mile High Swinging Bridge is included in your Grandfather Mountain admission ticket that includes many other things to do in our nature park. Buy tickets online and book a reservation time to enter the park. You do not need a separate reservation for the bridge. It’s open, weather permitting, every day of the year except Thanksgiving and Christmas Day.

For Tickets, please visit https://grandfather.com/tickets/

Grandfather Mountain is located at 2050 Blowing Rock Highway, Linville, NC 28646.